§ 14-60. City responsible for permanent repair.  


Latest version.
  • The permanent repair of street openings shall be the responsibility of the city. The city shall charge each permittee a fee for cost of the permanent repair based on the area of the final repair as calculated by the city engineer. The square yard unit prices shall be annually determined by the city engineer in accordance with current costs and construction practices. A uniform method on which to base these costs shall be prescribed by the city engineer and approved by the director of public works.

    In the event the size of the permanent repair exceeds the estimated size of permanent repair, the permittee shall pay the additional fee to the city within ten (10) working days. Failure to pay the additional fee will result in the permittee forfeiting any rights to future permits until the outstanding balance is received.

(Ord. No. 454, § l, 2-9-84; Ord. No. 715, 10-9-97; Ord. No. 791, 4-14-05; Ord. No. 818, 4-12-07)